Almalyk MMC JSC

Almalyk

Geographical location

Republic of Uzbekistan, Tashkent Region, city of Almalyk

  • Norgeo LLC has performed geological investigation works for Almalyk MMC JSC mining company in Uzbekistan in the framework of a contract with SRK consulting. Drilling works were performed with core extraction with diameter of 76mm (PQ) using two Atlas Copco CS14 drilling rigs.  The average drilling depth was 350 meters and the deepest one was 600 linear meters. The main point of the works was short time period given for the whole project, all the works were realized in three months, starting from July and executing in October including the mobilisation works.