ARMANIS GOLD MINE

Sagamar

Geographical location

Lori region, Armanis gold-polymetallic mine.

  • In the area of Armanis gold-polymetallic mine RC (Reverse Circulation) drilling were performed with drill rig GEMEX RC 250. 16000 linear meters of drilling was done with diameters 121-133mm, maximum dip 50-degrees, maximum depth 150m. The work began in September 2014 and ended in December 2014.